Username or Email
Password
Forgot?
Register
European Drilling Engineering Association
Menu
Skip to content
Home
About Us
Members
Meetings
2021 Meeting Programme
Next Meeting
Previous Meetings
Documents
Join Us
News
Contact
Archives
All documents for Q4 2010
Welcome
Trapped Annular Pressure Mitigation – A fluid solution
Experiences of drilling with OBM and WBM through reactive clay formations
CoilFlat CT Liner JIP (Ref DEA-163US)
Top hole drilling: cuttings size / rheology of drilling fluid – what are the relevant parameters
Close of Day Two
Optimized drilling fluid rheology to address specific drilling challenges
Recent lessons learned from cementing operations in Shell’s European operations
Offshore thermal processing of non aqueous drill cuttings
Post navigation
←
Older posts